End-to-End Workflows
Swimlane maps across core manufacturing and quality processes
About this view
These swimlane maps show cross-functional handoffs from execution through release and continuous improvement. Each lane represents a role while columns represent deterministic flow stages that mirror seeded records. The workflow set aligns with GMP documentation, investigation, and readiness controls across manufacturing and quality teams. Next actions include drilling from workflow phases into the linked operational modules.
Batch Execution to QA Release
Planner
Plan Batch
Reserve Line
Confirm Materials
Release to Floor
-
-
-
-
Operator
Line Clearance
Execute EBR
Record IPC
Handle Exceptions
Reconcile
-
-
-
QC Analyst
-
Collect Samples
-
Run Tests
Review Results
-
-
-
QA Reviewer
-
-
-
Review Exceptions
Review Deviations
Review EBR
Disposition
Release
System
Audit Trail
Step Logs
Risk Scoring
Deviation Linkage
Readiness Score
Signatures
COA Link
Archive
Deviation to Investigation to CAPA Closure
Operator
Detect Event
Open Deviation
Containment
-
-
-
-
QA
-
Triage
Risk Assess
Assign Investigation
-
-
Close
Investigator
-
-
-
Hypotheses
Evidence Review
Root Cause
Link CAPA
CAPA Owner
-
-
-
-
Define Actions
Execute
Effectiveness Check
Change Control to Validation to Training to Deployment
Requester
Intake
Justify
-
-
-
-
-
QA/SME
-
Impact Analysis
Approval
-
Verification
-
Close
Validation
-
-
Plan Protocols
Execute Validation
Report
-
-
Training
-
-
-
Build Training
Assign Courses
Complete Records
-
Material Receipt to Sampling to QC Release to Issue to Batch
Warehouse
Receive
Quarantine
Store
-
Issue
-
-
QC
-
Sample
Test
Review
-
-
-
QA
-
-
-
Disposition
-
-
-
Manufacturing
-
-
-
-
Consume
Record Lot
Genealogy
Maintenance and Calibration to Equipment Readiness
Maintenance
Open WO
Plan Parts
Execute WO
Close WO
-
-
-
Calibration
-
Schedule Cal
Perform Cal
Certify
-
-
-
QA/Engineering
-
-
Review Evidence
Approve Fitness
Release Equipment
-
-
System
Status Lock
Audit Events
Alerts
Readiness Update
Scheduling Sync
-
-