This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.
Planned
2024-03-18 → 2024-04-01
Actual
2025-05-17 → In progress
Exceptions
20
Release Risk
medium
Step Timeline
| Step | Status | Start | End | Result |
|---|
Materials Consumed and Genealogy
| Lot | Material | Status | Genealogy |
|---|---|---|---|
| LOT-012019 | Talc Variant 7 | quarantine | Open workbench |
| LOT-012020 | Colloidal Silicon Dioxide Variant 7 | hold | Open workbench |
| LOT-012021 | Stearic Acid Variant 7 | rejected | Open workbench |
| LOT-012022 | Titanium Dioxide Variant 7 | expired | Open workbench |
| LOT-012023 | Polyethylene Glycol 400 Variant 7 | consumed | Open workbench |
| LOT-012024 | Polysorbate 80 Variant 7 | in-process | Open workbench |
| LOT-012025 | Mannitol Variant 7 | approved | Open workbench |
| LOT-012026 | Sucrose Variant 7 | approved | Open workbench |
| LOT-012027 | Trehalose Variant 7 | approved | Open workbench |
Equipment and Calibration
| Asset | Status | Calibration Due | Qualification |
|---|---|---|---|
| AST-01237 X-Ray Inspection #238 | cleaning-required | 2025-01-14 | qualified |
| AST-01238 Leak Tester #239 | operational | 2025-12-30 | requalification-due |
| AST-01239 Torque Tester #240 | operational | 2025-12-31 | not-qualified |
| AST-01240 Granulator #241 | operational | 2024-11-17 | qualified |
| AST-01241 Tablet Press #242 | in-calibration | 2025-12-06 | qualified |
| AST-01242 Film Coater #243 | in-maintenance | 2026-03-03 | qualified |
| AST-01243 Capsule Filler #244 | out-of-service | 2026-02-09 | requalification-due |
In-Process Controls and Pending Tests
| Control | Measured | Spec | Status |
|---|
Exceptions and Deviations
| Exception | Severity | Status | Deviation |
|---|---|---|---|
| Equipment Conflict | major | under-review | dev-00892 |
| Equipment Conflict | major | under-review | Not linked |
| Equipment Conflict | major | under-review | dev-01392 |
| Equipment Conflict | major | under-review | dev-00892 |
| Equipment Conflict | major | under-review | Not linked |
| Equipment Conflict | major | under-review | Not linked |
QA Review Checklist and Signatures
- Step execution completeness verified with signed evidence.
- All high-severity exceptions dispositioned or justified.
- QC release tests reviewed and OOS investigations closed or dispositioned.
- Final release signatory validated with segregation-of-duties check.