About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-08-30 → 2024-09-13
Actual
2025-10-22 → 2024-04-18
Exceptions
2
Release Risk
low
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010532Ethanol 95% Variant 7approvedOpen workbench
LOT-010533Isopropyl Alcohol Variant 7approvedOpen workbench
LOT-010534Methylene Chloride Variant 7quarantineOpen workbench
LOT-010535Acetonitrile HPLC Grade Variant 7holdOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01249 Filling Machine #250in-maintenance2025-03-23not-qualified
AST-01250 Visual Inspection System #251out-of-service2026-04-25qualified
AST-01251 Weighing Balance #252cleaning-required2025-07-12qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Equipment Conflictmajorcloseddev-00884
Equipment Conflictmajorcloseddev-00384
Equipment ConflictmajorclosedNot linked
Equipment ConflictmajorclosedNot linked
Equipment ConflictmajorclosedNot linked
Equipment ConflictmajorclosedNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.