About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-07-31 → 2024-08-08
Actual
2024-05-12 → 2025-01-10
Exceptions
0
Release Risk
low
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012559Talc Variant 5quarantineOpen workbench
LOT-012560Colloidal Silicon Dioxide Variant 5holdOpen workbench
LOT-012561Stearic Acid Variant 5rejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01318 Leak Tester #319in-calibration2026-02-08requalification-due
AST-01319 Torque Tester #320in-maintenance2026-03-01not-qualified
AST-01320 Granulator #321out-of-service2026-03-30qualified
AST-01321 Tablet Press #322cleaning-required2025-04-30qualified
AST-01322 Film Coater #323operational2025-04-11qualified
AST-01323 Capsule Filler #324operational2025-10-01requalification-due
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Environmental ExcursionmajorclosedNot linked
Environmental Excursionmajorcloseddev-00354
Environmental Excursionmajorcloseddev-01354
Environmental Excursionmajorcloseddev-00854
Environmental ExcursionmajorclosedNot linked
Environmental Excursionmajorcloseddev-01354
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.