About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2025-02-02 → 2025-02-06
Actual
2024-06-30 → In progress
Exceptions
18
Release Risk
medium
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011150Colloidal Silicon Dioxide Variant 8consumedOpen workbench
LOT-011151Stearic Acid Variant 8in-processOpen workbench
LOT-011152Titanium Dioxide Variant 8approvedOpen workbench
LOT-011153Polyethylene Glycol 400 Variant 8approvedOpen workbench
LOT-011154Polysorbate 80 Variant 8approvedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01120 Granulator #121operational2024-11-05qualified
AST-01121 Tablet Press #122operational2026-06-17qualified
AST-01122 Film Coater #123in-calibration2025-03-07qualified
AST-01123 Capsule Filler #124in-maintenance2025-01-24requalification-due
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Procedure Deviationcriticalopendev-00831
Procedure Deviationcriticalopendev-00331
Procedure Deviationcriticalopendev-01331
Procedure Deviationcriticalopendev-00831
Procedure Deviationcriticalopendev-00331
Procedure DeviationcriticalopenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.