About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2026-12-26 → 2027-01-03
Actual
2024-08-05 → 2025-09-13
Exceptions
24
Release Risk
critical
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012621Stearic Acid Variant 7approvedOpen workbench
LOT-012622Titanium Dioxide Variant 7quarantineOpen workbench
LOT-012623Polyethylene Glycol 400 Variant 7holdOpen workbench
LOT-012624Polysorbate 80 Variant 7rejectedOpen workbench
LOT-012625Mannitol Variant 7expiredOpen workbench
LOT-012626Sucrose Variant 7consumedOpen workbench
LOT-012627Trehalose Variant 7in-processOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01009 Filling Machine #10operational2026-08-10not-qualified
AST-01010 Visual Inspection System #11in-calibration2025-05-23qualified
AST-01011 Weighing Balance #12in-maintenance2026-05-08qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Equipment Conflictmajorcloseddev-00804
Equipment ConflictmajorclosedNot linked
Equipment Conflictmajorcloseddev-01304
Equipment ConflictmajorclosedNot linked
Equipment Conflictmajorcloseddev-00304
Equipment ConflictmajorclosedNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.