About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-12-10 → 2024-12-22
Actual
2025-02-06 → 2025-07-26
Exceptions
25
Release Risk
low
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012304Methylene Chloride Variant 6approvedOpen workbench
LOT-012305Acetonitrile HPLC Grade Variant 6approvedOpen workbench
LOT-012306Methanol HPLC Grade Variant 6approvedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01304 Compressed Air System #305in-calibration2026-05-29not-qualified
AST-01305 HVAC Unit #306in-maintenance2024-11-22qualified
AST-01306 Refrigerator #307out-of-service2024-10-09qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Out of Specificationminorcloseddev-00769
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
Out of Specificationminorcloseddev-00269
Out of Specificationminorcloseddev-01269
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.