About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-07-28 → 2024-08-06
Actual
2026-10-13 → 2025-10-22
Exceptions
15
Release Risk
low
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012289Talc Variant 6quarantineOpen workbench
LOT-012290Colloidal Silicon Dioxide Variant 6holdOpen workbench
LOT-012291Stearic Acid Variant 6rejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01326 Bioreactor #327in-maintenance2026-01-21qualified
AST-01327 Centrifuge #328out-of-service2025-04-18qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Equipment ConflictmajorclosedNot linked
Equipment Conflictmajorcloseddev-00264
Equipment ConflictmajorclosedNot linked
Equipment ConflictmajorclosedNot linked
Equipment Conflictmajorcloseddev-00264
Equipment ConflictmajorclosedNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.