About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-11-03 → 2024-11-15
Actual
2026-11-30 → 2026-06-26
Exceptions
24
Release Risk
medium
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011220Water for InjectionrejectedOpen workbench
LOT-011221Purified WaterexpiredOpen workbench
LOT-011222Ethanol 95%consumedOpen workbench
LOT-011223Isopropyl Alcoholin-processOpen workbench
LOT-011224Methylene ChlorideapprovedOpen workbench
LOT-011225Acetonitrile HPLC GradeapprovedOpen workbench
LOT-011226Methanol HPLC GradeapprovedOpen workbench
LOT-011227Hydrochloric Acid 37%quarantineOpen workbench
LOT-011228Sodium HydroxideholdOpen workbench
LOT-011229Phosphoric AcidrejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01176 Hardness Tester #177operational2025-02-14qualified
AST-01177 Friability Tester #178operational2025-01-10qualified
AST-01178 Particle Size Analyzer #179in-calibration2025-07-27requalification-due
AST-01179 Microscope #180in-maintenance2024-12-17not-qualified
AST-01180 Laminar Flow Cabinet #181out-of-service2026-05-03qualified
AST-01181 Isolator #182cleaning-required2026-04-04qualified
AST-01182 WFI Still #183operational2025-09-12qualified
AST-01183 RO System #184operational2025-07-02requalification-due
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Late Stepmajorunder-reviewNot linked
Late Stepmajorunder-reviewNot linked
Late Stepmajorunder-reviewNot linked
Late Stepmajorunder-reviewdev-00723
Late Stepmajorunder-reviewNot linked
Late Stepmajorunder-reviewNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.