About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-05-23 → 2024-06-06
Actual
2026-07-16 → 2024-02-21
Exceptions
21
Release Risk
critical
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011655Hydroxypropyl Methylcellulose Variant 5in-processOpen workbench
LOT-011656Magnesium Stearate Variant 5approvedOpen workbench
LOT-011657Croscarmellose Sodium Variant 5approvedOpen workbench
LOT-011658Povidone K30 Variant 5approvedOpen workbench
LOT-011659Talc Variant 5quarantineOpen workbench
LOT-011660Colloidal Silicon Dioxide Variant 5holdOpen workbench
LOT-011661Stearic Acid Variant 5rejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01130 Visual Inspection System #131in-maintenance2025-09-14qualified
AST-01131 Weighing Balance #132out-of-service2026-02-22qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Missing SignatureminoropenNot linked
Missing SignatureminoropenNot linked
Missing SignatureminoropenNot linked
Missing SignatureminoropenNot linked
Missing Signatureminoropendev-00166
Missing SignatureminoropenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.