About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-05-25 → 2024-06-08
Actual
2025-11-02 → 2026-08-14
Exceptions
10
Release Risk
low
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010240Active Pharmaceutical Ingredient A Variant 8expiredOpen workbench
LOT-010241Active Pharmaceutical Ingredient B Variant 8consumedOpen workbench
LOT-010242Active Pharmaceutical Ingredient C Variant 8in-processOpen workbench
LOT-010243Microcrystalline Cellulose Variant 8approvedOpen workbench
LOT-010244Lactose Monohydrate Variant 8approvedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01344 Compressed Air System #345operational2025-05-15not-qualified
AST-01345 HVAC Unit #346operational2026-03-28qualified
AST-01346 Refrigerator #347in-calibration2025-11-24qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.