About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2025-05-23 → 2025-05-31
Actual
2024-04-29 → In progress
Exceptions
22
Release Risk
medium
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012800Colloidal Silicon Dioxide Variant 3approvedOpen workbench
LOT-012801Stearic Acid Variant 3approvedOpen workbench
LOT-012802Titanium Dioxide Variant 3quarantineOpen workbench
LOT-012803Polyethylene Glycol 400 Variant 3holdOpen workbench
LOT-012804Polysorbate 80 Variant 3rejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01240 Granulator #241operational2024-11-17qualified
AST-01241 Tablet Press #242in-calibration2025-12-06qualified
AST-01242 Film Coater #243in-maintenance2026-03-03qualified
AST-01243 Capsule Filler #244out-of-service2026-02-09requalification-due
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Out of Specificationcriticalopendev-00561
Out of SpecificationcriticalopenNot linked
Out of Specificationcriticalopendev-01061
Out of Specificationcriticalopendev-00561
Out of Specificationcriticalopendev-00061
Out of SpecificationcriticalopenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.