About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-09-24 → 2024-10-06
Actual
2024-04-12 → 2026-12-06
Exceptions
22
Release Risk
medium
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011440Active Pharmaceutical Ingredient A Variant 8approvedOpen workbench
LOT-011441Active Pharmaceutical Ingredient B Variant 8approvedOpen workbench
LOT-011442Active Pharmaceutical Ingredient C Variant 8approvedOpen workbench
LOT-011443Microcrystalline Cellulose Variant 8quarantineOpen workbench
LOT-011444Lactose Monohydrate Variant 8holdOpen workbench
LOT-011445Hydroxypropyl Methylcellulose Variant 8rejectedOpen workbench
LOT-011446Magnesium Stearate Variant 8expiredOpen workbench
LOT-011447Croscarmellose Sodium Variant 8consumedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01285 Autoclave #286out-of-service2026-03-02qualified
AST-01286 Bioreactor #287cleaning-required2025-09-30qualified
AST-01287 Centrifuge #288operational2025-05-15qualified
AST-01288 Lyophilizer #289operational2026-01-06requalification-due
AST-01289 Filling Machine #290operational2026-10-06not-qualified
AST-01290 Visual Inspection System #291in-calibration2025-07-30qualified
AST-01291 Weighing Balance #292in-maintenance2026-05-11qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Equipment Conflictminoropendev-00556
Equipment ConflictminoropenNot linked
Equipment ConflictminoropenNot linked
Equipment ConflictminoropenNot linked
Equipment ConflictminoropenNot linked
Equipment ConflictminoropenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.