About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-07-17 → 2024-07-30
Actual
2025-02-19 → 2025-03-25
Exceptions
2
Release Risk
critical
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012180Water for Injection Variant 2approvedOpen workbench
LOT-012181Purified Water Variant 2quarantineOpen workbench
LOT-012182Ethanol 95% Variant 2holdOpen workbench
LOT-012183Isopropyl Alcohol Variant 2rejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01070 Conveyor Belt #71operational2026-01-26qualified
AST-01071 Labeling Machine #72operational2025-07-27qualified
AST-01072 Cartoning Machine #73operational2024-10-01qualified
AST-01073 Blister Packer #74in-calibration2024-11-11requalification-due
AST-01074 Shrink Wrapper #75in-maintenance2026-01-18not-qualified
AST-01075 Checkweigher #76out-of-service2026-09-09qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Missing SignatureminoropenNot linked
Missing SignatureminoropenNot linked
Missing Signatureminoropendev-01046
Missing SignatureminoropenNot linked
Missing SignatureminoropenNot linked
Missing SignatureminoropenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
No release readiness record found.