Batch BT-020539
Vaccelox • SGP • L040 • planned
About this view
This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.
Planned
2026-02-18 → 2026-03-03
Actual
Pending → In progress
Exceptions
7
Release Risk
critical
Step Timeline
| Step | Status | Start | End | Result |
|---|
Materials Consumed and Genealogy
| Lot | Material | Status | Genealogy |
|---|---|---|---|
| LOT-010773 | Isopropyl Alcohol Variant 5 | in-process | Open workbench |
| LOT-010774 | Methylene Chloride Variant 5 | approved | Open workbench |
| LOT-010775 | Acetonitrile HPLC Grade Variant 5 | approved | Open workbench |
| LOT-010776 | Methanol HPLC Grade Variant 5 | approved | Open workbench |
| LOT-010777 | Hydrochloric Acid 37% Variant 5 | quarantine | Open workbench |
| LOT-010778 | Sodium Hydroxide Variant 5 | hold | Open workbench |
| LOT-010779 | Phosphoric Acid Variant 5 | rejected | Open workbench |
Equipment and Calibration
| Asset | Status | Calibration Due | Qualification |
|---|---|---|---|
| AST-01312 Cartoning Machine #313 | in-maintenance | 2025-05-11 | qualified |
| AST-01313 Blister Packer #314 | out-of-service | 2026-05-26 | requalification-due |
| AST-01314 Shrink Wrapper #315 | cleaning-required | 2024-10-05 | not-qualified |
| AST-01315 Checkweigher #316 | operational | 2024-12-28 | qualified |
| AST-01316 Metal Detector #317 | operational | 2026-01-11 | qualified |
| AST-01317 X-Ray Inspection #318 | operational | 2025-07-19 | qualified |
| AST-01318 Leak Tester #319 | in-calibration | 2026-02-08 | requalification-due |
| AST-01319 Torque Tester #320 | in-maintenance | 2026-03-01 | not-qualified |
In-Process Controls and Pending Tests
| Control | Measured | Spec | Status |
|---|
QA Review Checklist and Signatures
- Step execution completeness verified with signed evidence.
- All high-severity exceptions dispositioned or justified.
- QC release tests reviewed and OOS investigations closed or dispositioned.
- Final release signatory validated with segregation-of-duties check.
No release readiness record found.