About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2025-05-21 → 2025-05-31
Actual
2025-03-01 → In progress
Exceptions
25
Release Risk
medium
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010768Histidine Buffer Variant 5quarantineOpen workbench
LOT-010769Sodium Chloride Variant 5holdOpen workbench
LOT-010770Water for Injection Variant 5rejectedOpen workbench
LOT-010771Purified Water Variant 5expiredOpen workbench
LOT-010772Ethanol 95% Variant 5consumedOpen workbench
LOT-010773Isopropyl Alcohol Variant 5in-processOpen workbench
LOT-010774Methylene Chloride Variant 5approvedOpen workbench
LOT-010775Acetonitrile HPLC Grade Variant 5approvedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01097 Friability Tester #98cleaning-required2024-12-15qualified
AST-01098 Particle Size Analyzer #99operational2025-09-27requalification-due
AST-01099 Microscope #100operational2026-03-30not-qualified
AST-01100 Laminar Flow Cabinet #101operational2025-11-13qualified
AST-01101 Isolator #102in-calibration2024-07-18qualified
AST-01102 WFI Still #103in-maintenance2025-12-13qualified
AST-01103 RO System #104out-of-service2025-09-05requalification-due
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
System Errormajorunder-reviewNot linked
System Errormajorunder-reviewNot linked
System Errormajorunder-reviewdev-00972
System Errormajorunder-reviewNot linked
System Errormajorunder-reviewdev-01472
System Errormajorunder-reviewNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020471
Score: 75
EBR completionComplete
Exceptions closedComplete
QC approvedOpen
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedOpen

Release review in progress - minor items pending.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.