About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2026-04-02 → 2026-04-16
Actual
2025-10-10 → In progress
Exceptions
0
Release Risk
medium
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011880Water for Injection Variant 2in-processOpen workbench
LOT-011881Purified Water Variant 2approvedOpen workbench
LOT-011882Ethanol 95% Variant 2approvedOpen workbench
LOT-011883Isopropyl Alcohol Variant 2approvedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01350 Conveyor Belt #351operational2025-06-12qualified
AST-01351 Labeling Machine #352operational2025-03-08qualified
AST-01352 Cartoning Machine #353operational2025-10-02qualified
AST-01353 Blister Packer #354in-calibration2024-10-01requalification-due
AST-01354 Shrink Wrapper #355in-maintenance2024-08-19not-qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Procedure DeviationcriticalopenNot linked
Procedure Deviationcriticalopendev-01471
Procedure DeviationcriticalopenNot linked
Procedure DeviationcriticalopenNot linked
Procedure Deviationcriticalopendev-01471
Procedure DeviationcriticalopenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020470
Score: 91
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedOpen

Release review complete - all criteria met.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.