About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-06-09 → 2024-06-17
Actual
2026-09-10 → In progress
Exceptions
21
Release Risk
critical
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012305Acetonitrile HPLC Grade Variant 6approvedOpen workbench
LOT-012306Methanol HPLC Grade Variant 6approvedOpen workbench
LOT-012307Hydrochloric Acid 37% Variant 6quarantineOpen workbench
LOT-012308Sodium Hydroxide Variant 6holdOpen workbench
LOT-012309Phosphoric Acid Variant 6rejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01244 Blender #245cleaning-required2026-04-06not-qualified
AST-01245 Autoclave #246operational2026-09-16qualified
AST-01246 Bioreactor #247operational2025-09-11qualified
AST-01247 Centrifuge #248operational2026-02-10qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewdev-00962
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020461
Score: 81
EBR completionOpen
Exceptions closedComplete
QC approvedOpen
Deviations dispositionedComplete
Calibration compliantOpen
Training confirmedComplete

Release review in progress - minor items pending.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.