About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2026-07-29 → 2026-08-07
Actual
2026-09-23 → In progress
Exceptions
14
Release Risk
high
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011840Colloidal Silicon Dioxide Variant 1holdOpen workbench
LOT-011841Stearic Acid Variant 1rejectedOpen workbench
LOT-011842Titanium Dioxide Variant 1expiredOpen workbench
LOT-011843Polyethylene Glycol 400 Variant 1consumedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01300 Laminar Flow Cabinet #301cleaning-required2026-07-05qualified
AST-01301 Isolator #302operational2026-03-10qualified
AST-01302 WFI Still #303operational2025-11-25qualified
AST-01303 RO System #304operational2026-05-07requalification-due
AST-01304 Compressed Air System #305in-calibration2026-05-29not-qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Material DiscrepancycriticalopenNot linked
Material DiscrepancycriticalopenNot linked
Material DiscrepancycriticalopenNot linked
Material DiscrepancycriticalopenNot linked
Material DiscrepancycriticalopenNot linked
Material DiscrepancycriticalopenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020460
Score: 100
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review complete - all criteria met.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.