About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2025-05-29 → 2025-06-11
Actual
2024-05-01 → 2026-11-04
Exceptions
20
Release Risk
low
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011728Histidine Buffer Variant 7approvedOpen workbench
LOT-011729Sodium Chloride Variant 7approvedOpen workbench
LOT-011730Water for Injection Variant 7approvedOpen workbench
LOT-011731Purified Water Variant 7quarantineOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01128 Lyophilizer #129operational2025-07-24requalification-due
AST-01129 Filling Machine #130in-calibration2025-02-21not-qualified
AST-01130 Visual Inspection System #131in-maintenance2025-09-14qualified
AST-01131 Weighing Balance #132out-of-service2026-02-22qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Out of Specificationmajorunder-reviewNot linked
Out of Specificationmajorunder-reviewNot linked
Out of Specificationmajorunder-reviewNot linked
Out of Specificationmajorunder-reviewNot linked
Out of Specificationmajorunder-reviewdev-01433
Out of Specificationmajorunder-reviewNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020432
Score: 91
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedOpen

Release review complete - all criteria met.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.