This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-09-20 → 2024-09-23
Actual
2024-03-21 → In progress
Exceptions
11
Release Risk
high
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012150Water for Injection Variant 1in-processOpen workbench
LOT-012151Purified Water Variant 1approvedOpen workbench
LOT-012152Ethanol 95% Variant 1approvedOpen workbench
LOT-012153Isopropyl Alcohol Variant 1approvedOpen workbench
LOT-012154Methylene Chloride Variant 1quarantineOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01150 Conveyor Belt #151in-calibration2025-01-02qualified
AST-01151 Labeling Machine #152in-maintenance2026-07-06qualified
AST-01152 Cartoning Machine #153out-of-service2025-12-14qualified
AST-01153 Blister Packer #154cleaning-required2024-08-19requalification-due
AST-01154 Shrink Wrapper #155operational2026-03-04not-qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Procedure DeviationcriticalopenNot linked
Procedure Deviationcriticalopendev-01431
Procedure DeviationcriticalopenNot linked
Procedure DeviationcriticalopenNot linked
Procedure DeviationcriticalopenNot linked
Procedure DeviationcriticalopenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020430
Score: 99
EBR completionOpen
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review complete - all criteria met.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.