About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-05-15 → 2024-05-21
Actual
2024-02-28 → 2025-07-15
Exceptions
2
Release Risk
high
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012090Water for Injection Variant 9approvedOpen workbench
LOT-012091Purified Water Variant 9quarantineOpen workbench
LOT-012092Ethanol 95% Variant 9holdOpen workbench
LOT-012093Isopropyl Alcohol Variant 9rejectedOpen workbench
LOT-012094Methylene Chloride Variant 9expiredOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01072 Cartoning Machine #73operational2024-10-01qualified
AST-01073 Blister Packer #74in-calibration2024-11-11requalification-due
AST-01074 Shrink Wrapper #75in-maintenance2026-01-18not-qualified
AST-01075 Checkweigher #76out-of-service2026-09-09qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Late StepminorclosedNot linked
Late StepminorclosedNot linked
Late StepminorclosedNot linked
Late StepminorclosedNot linked
Late StepminorclosedNot linked
Late StepminorclosedNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020418
Score: 73
EBR completionComplete
Exceptions closedOpen
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review blocked - critical items outstanding.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.