About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2025-04-05 → 2025-04-17
Actual
2025-09-26 → 2026-12-29
Exceptions
14
Release Risk
medium
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011158Histidine Buffer Variant 8expiredOpen workbench
LOT-011159Sodium Chloride Variant 8consumedOpen workbench
LOT-011160Water for Injection Variant 8in-processOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01358 Leak Tester #359operational2025-04-08requalification-due
AST-01359 Torque Tester #360operational2025-07-28not-qualified
AST-01360 Granulator #361in-calibration2025-10-29qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Late Stepminorunder-reviewNot linked
Late Stepminorunder-reviewNot linked
Late Stepminorunder-reviewNot linked
Late Stepminorunder-reviewNot linked
Late Stepminorunder-reviewNot linked
Late Stepminorunder-reviewNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020386
Score: 66
EBR completionComplete
Exceptions closedOpen
QC approvedOpen
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review blocked - critical items outstanding.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.