Batch BT-020342
Dermazol • CMO1 • L043 • completed
About this view
This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.
Planned
2026-05-09 → 2026-05-21
Actual
2024-05-05 → 2026-09-17
Exceptions
19
Release Risk
low
Step Timeline
| Step | Status | Start | End | Result |
|---|
Materials Consumed and Genealogy
| Lot | Material | Status | Genealogy |
|---|---|---|---|
| LOT-012052 | Titanium Dioxide Variant 8 | approved | Open workbench |
| LOT-012053 | Polyethylene Glycol 400 Variant 8 | approved | Open workbench |
| LOT-012054 | Polysorbate 80 Variant 8 | approved | Open workbench |
| LOT-012055 | Mannitol Variant 8 | quarantine | Open workbench |
| LOT-012056 | Sucrose Variant 8 | hold | Open workbench |
| LOT-012057 | Trehalose Variant 8 | rejected | Open workbench |
Equipment and Calibration
| Asset | Status | Calibration Due | Qualification |
|---|---|---|---|
| AST-01168 Lyophilizer #169 | operational | 2024-06-02 | requalification-due |
| AST-01169 Filling Machine #170 | operational | 2026-04-30 | not-qualified |
| AST-01170 Visual Inspection System #171 | operational | 2025-02-18 | qualified |
| AST-01171 Weighing Balance #172 | in-calibration | 2025-05-11 | qualified |
In-Process Controls and Pending Tests
| Control | Measured | Spec | Status |
|---|
Exceptions and Deviations
| Exception | Severity | Status | Deviation |
|---|---|---|---|
| Procedure Deviation | major | under-review | Not linked |
| Procedure Deviation | major | under-review | Not linked |
| Procedure Deviation | major | under-review | dev-00843 |
| Procedure Deviation | major | under-review | Not linked |
| Procedure Deviation | major | under-review | Not linked |
| Procedure Deviation | major | under-review | Not linked |
QA Review Checklist and Signatures
- Step execution completeness verified with signed evidence.
- All high-severity exceptions dispositioned or justified.
- QC release tests reviewed and OOS investigations closed or dispositioned.
- Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020342
Score: 79
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete
Release review in progress - minor items pending.
Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.