About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2026-07-17 → 2026-07-27
Actual
2024-07-14 → In progress
Exceptions
25
Release Risk
medium
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012880Active Pharmaceutical Ingredient A Variant 6approvedOpen workbench
LOT-012881Active Pharmaceutical Ingredient B Variant 6approvedOpen workbench
LOT-012882Active Pharmaceutical Ingredient C Variant 6approvedOpen workbench
LOT-012883Microcrystalline Cellulose Variant 6quarantineOpen workbench
LOT-012884Lactose Monohydrate Variant 6holdOpen workbench
LOT-012885Hydroxypropyl Methylcellulose Variant 6rejectedOpen workbench
LOT-012886Magnesium Stearate Variant 6expiredOpen workbench
LOT-012887Croscarmellose Sodium Variant 6consumedOpen workbench
LOT-012888Povidone K30 Variant 6in-processOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01160 Granulator #161cleaning-required2026-03-30qualified
AST-01161 Tablet Press #162operational2025-08-10qualified
AST-01162 Film Coater #163operational2025-10-05qualified
AST-01163 Capsule Filler #164operational2025-01-25requalification-due
AST-01164 Blender #165in-calibration2025-09-18not-qualified
AST-01165 Autoclave #166in-maintenance2025-08-05qualified
AST-01166 Bioreactor #167out-of-service2025-07-30qualified
AST-01167 Centrifuge #168cleaning-required2024-12-24qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Out of Specificationcriticalopendev-00321
Out of SpecificationcriticalopenNot linked
Out of SpecificationcriticalopenNot linked
Out of SpecificationcriticalopenNot linked
Out of SpecificationcriticalopenNot linked
Out of SpecificationcriticalopenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020320
Score: 60
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review blocked - critical items outstanding.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.