About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-12-25 → 2025-01-04
Actual
2025-07-30 → 2026-12-22
Exceptions
19
Release Risk
high
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010912Titanium DioxidequarantineOpen workbench
LOT-010913Polyethylene Glycol 400holdOpen workbench
LOT-010914Polysorbate 80rejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01112 Cartoning Machine #113operational2026-01-29qualified
AST-01113 Blister Packer #114operational2026-01-03requalification-due
AST-01114 Shrink Wrapper #115operational2025-02-12not-qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020304
Score: 91
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedOpen
Calibration compliantComplete
Training confirmedComplete

Release review complete - all criteria met.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.