Batch BT-020303
Celdurin IV • CMO2 • L004 • completed
About this view
This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.
Planned
2026-08-07 → 2026-08-20
Actual
2025-12-05 → 2026-06-07
Exceptions
23
Release Risk
medium
Step Timeline
| Step | Status | Start | End | Result |
|---|
Materials Consumed and Genealogy
| Lot | Material | Status | Genealogy |
|---|---|---|---|
| LOT-011515 | Mannitol | quarantine | Open workbench |
| LOT-011516 | Sucrose | hold | Open workbench |
| LOT-011517 | Trehalose | rejected | Open workbench |
| LOT-011518 | Histidine Buffer | expired | Open workbench |
| LOT-011519 | Sodium Chloride | consumed | Open workbench |
Equipment and Calibration
| Asset | Status | Calibration Due | Qualification |
|---|---|---|---|
| AST-01218 Particle Size Analyzer #219 | operational | 2025-11-01 | requalification-due |
| AST-01219 Microscope #220 | operational | 2024-12-13 | not-qualified |
| AST-01220 Laminar Flow Cabinet #221 | in-calibration | 2026-04-02 | qualified |
| AST-01221 Isolator #222 | in-maintenance | 2025-09-02 | qualified |
| AST-01222 WFI Still #223 | out-of-service | 2026-05-11 | qualified |
| AST-01223 RO System #224 | cleaning-required | 2025-07-31 | requalification-due |
In-Process Controls and Pending Tests
| Control | Measured | Spec | Status |
|---|
QA Review Checklist and Signatures
- Step execution completeness verified with signed evidence.
- All high-severity exceptions dispositioned or justified.
- QC release tests reviewed and OOS investigations closed or dispositioned.
- Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020303
Score: 76
EBR completionComplete
Exceptions closedComplete
QC approvedOpen
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedOpen
Release review in progress - minor items pending.
Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.