About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-10-26 → 2024-11-08
Actual
2025-07-27 → 2026-10-09
Exceptions
24
Release Risk
critical
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012104Lactose MonohydrateconsumedOpen workbench
LOT-012105Hydroxypropyl Methylcellulosein-processOpen workbench
LOT-012106Magnesium StearateapprovedOpen workbench
LOT-012107Croscarmellose SodiumapprovedOpen workbench
LOT-012108Povidone K30approvedOpen workbench
LOT-012109TalcquarantineOpen workbench
LOT-012110Colloidal Silicon DioxideholdOpen workbench
LOT-012111Stearic AcidrejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01126 Bioreactor #127operational2026-01-30qualified
AST-01127 Centrifuge #128operational2026-02-27qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
System ErrormajorclosedNot linked
System Errormajorcloseddev-01264
System ErrormajorclosedNot linked
System Errormajorcloseddev-00264
System ErrormajorclosedNot linked
System ErrormajorclosedNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020263
Score: 72
EBR completionOpen
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review blocked - critical items outstanding.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.