About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2025-01-14 → 2025-01-26
Actual
2026-03-25 → 2026-12-13
Exceptions
7
Release Risk
low
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-012520Active Pharmaceutical Ingredient A Variant 4approvedOpen workbench
LOT-012521Active Pharmaceutical Ingredient B Variant 4approvedOpen workbench
LOT-012522Active Pharmaceutical Ingredient C Variant 4approvedOpen workbench
LOT-012523Microcrystalline Cellulose Variant 4quarantineOpen workbench
LOT-012524Lactose Monohydrate Variant 4holdOpen workbench
LOT-012525Hydroxypropyl Methylcellulose Variant 4rejectedOpen workbench
LOT-012526Magnesium Stearate Variant 4expiredOpen workbench
LOT-012527Croscarmellose Sodium Variant 4consumedOpen workbench
LOT-012528Povidone K30 Variant 4in-processOpen workbench
LOT-012529Talc Variant 4approvedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01208 Lyophilizer #209out-of-service2025-11-29requalification-due
AST-01209 Filling Machine #210cleaning-required2025-06-11not-qualified
AST-01210 Visual Inspection System #211operational2025-07-06qualified
AST-01211 Weighing Balance #212operational2025-04-26qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Material Discrepancymajorunder-reviewNot linked
Material Discrepancymajorunder-reviewNot linked
Material Discrepancymajorunder-reviewNot linked
Material Discrepancymajorunder-reviewdev-00253
Material Discrepancymajorunder-reviewNot linked
Material Discrepancymajorunder-reviewNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020252
Score: 84
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review in progress - minor items pending.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.