About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2026-12-28 → 2027-01-02
Actual
2024-03-05 → In progress
Exceptions
13
Release Risk
low
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011680Active Pharmaceutical Ingredient A Variant 6expiredOpen workbench
LOT-011681Active Pharmaceutical Ingredient B Variant 6consumedOpen workbench
LOT-011682Active Pharmaceutical Ingredient C Variant 6in-processOpen workbench
LOT-011683Microcrystalline Cellulose Variant 6approvedOpen workbench
LOT-011684Lactose Monohydrate Variant 6approvedOpen workbench
LOT-011685Hydroxypropyl Methylcellulose Variant 6approvedOpen workbench
LOT-011686Magnesium Stearate Variant 6quarantineOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01080 Granulator #81in-calibration2025-12-31qualified
AST-01081 Tablet Press #82in-maintenance2024-12-18qualified
AST-01082 Film Coater #83out-of-service2025-07-29qualified
AST-01083 Capsule Filler #84cleaning-required2025-04-29requalification-due
AST-01084 Blender #85operational2025-11-14not-qualified
AST-01085 Autoclave #86operational2025-05-11qualified
AST-01086 Bioreactor #87operational2024-09-24qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Out of SpecificationcriticalopenNot linked
Out of SpecificationcriticalopenNot linked
Out of SpecificationcriticalopenNot linked
Out of SpecificationcriticalopenNot linked
Out of SpecificationcriticalopenNot linked
Out of SpecificationcriticalopenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020240
Score: 100
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedOpen
Calibration compliantComplete
Training confirmedComplete

Release review complete - all criteria met.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.