About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-01-19 → 2024-01-29
Actual
2026-05-12 → In progress
Exceptions
17
Release Risk
high
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011540Colloidal Silicon Dioxide Variant 1approvedOpen workbench
LOT-011541Stearic Acid Variant 1approvedOpen workbench
LOT-011542Titanium Dioxide Variant 1quarantineOpen workbench
LOT-011543Polyethylene Glycol 400 Variant 1holdOpen workbench
LOT-011544Polysorbate 80 Variant 1rejectedOpen workbench
LOT-011545Mannitol Variant 1expiredOpen workbench
LOT-011546Sucrose Variant 1consumedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01260 Laminar Flow Cabinet #261operational2025-05-26qualified
AST-01261 Isolator #262operational2025-04-05qualified
AST-01262 WFI Still #263in-calibration2025-12-30qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Material Discrepancycriticalopendev-00221
Material Discrepancycriticalopendev-01221
Material DiscrepancycriticalopenNot linked
Material DiscrepancycriticalopenNot linked
Material DiscrepancycriticalopenNot linked
Material DiscrepancycriticalopenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020220
Score: 71
EBR completionOpen
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review blocked - critical items outstanding.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.