About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2025-04-05 → 2025-04-17
Actual
2026-05-12 → In progress
Exceptions
5
Release Risk
medium
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011600Colloidal Silicon Dioxide Variant 3consumedOpen workbench
LOT-011601Stearic Acid Variant 3in-processOpen workbench
LOT-011602Titanium Dioxide Variant 3approvedOpen workbench
LOT-011603Polyethylene Glycol 400 Variant 3approvedOpen workbench
LOT-011604Polysorbate 80 Variant 3approvedOpen workbench
LOT-011605Mannitol Variant 3quarantineOpen workbench
LOT-011606Sucrose Variant 3holdOpen workbench
LOT-011607Trehalose Variant 3rejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01200 Granulator #201in-maintenance2026-09-10qualified
AST-01201 Tablet Press #202out-of-service2025-09-13qualified
AST-01202 Film Coater #203cleaning-required2025-02-15qualified
AST-01203 Capsule Filler #204operational2024-09-06requalification-due
AST-01204 Blender #205operational2026-06-23not-qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Out of Specificationcriticalopendev-00201
Out of SpecificationcriticalopenNot linked
Out of SpecificationcriticalopenNot linked
Out of SpecificationcriticalopenNot linked
Out of Specificationcriticalopendev-01201
Out of Specificationcriticalopendev-00701
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020200
Score: 100
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review complete - all criteria met.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.