About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-01-20 → 2024-02-02
Actual
2026-12-03 → In progress
Exceptions
22
Release Risk
critical
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010985Acetonitrile HPLC Grade Variant 2holdOpen workbench
LOT-010986Methanol HPLC Grade Variant 2rejectedOpen workbench
LOT-010987Hydrochloric Acid 37% Variant 2expiredOpen workbench
LOT-010988Sodium Hydroxide Variant 2consumedOpen workbench
LOT-010989Phosphoric Acid Variant 2in-processOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01394 Shrink Wrapper #395operational2026-03-22not-qualified
AST-01395 Checkweigher #396in-calibration2025-10-15qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Environmental Excursionminorunder-reviewdev-00198
Environmental Excursionminorunder-reviewdev-01198
Environmental Excursionminorunder-reviewNot linked
Environmental Excursionminorunder-reviewNot linked
Environmental Excursionminorunder-reviewNot linked
Environmental Excursionminorunder-reviewNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020197
Score: 66
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review blocked - critical items outstanding.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.