About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2025-12-25 → 2025-12-30
Actual
Pending → In progress
Exceptions
15
Release Risk
critical
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-011790Water for Injection Variant 9in-processOpen workbench
LOT-011791Purified Water Variant 9approvedOpen workbench
LOT-011792Ethanol 95% Variant 9approvedOpen workbench
LOT-011793Isopropyl Alcohol Variant 9approvedOpen workbench
LOT-011794Methylene Chloride Variant 9quarantineOpen workbench
LOT-011795Acetonitrile HPLC Grade Variant 9holdOpen workbench
LOT-011796Methanol HPLC Grade Variant 9rejectedOpen workbench
LOT-011797Hydrochloric Acid 37% Variant 9expiredOpen workbench
LOT-011798Sodium Hydroxide Variant 9consumedOpen workbench
LOT-011799Phosphoric Acid Variant 9in-processOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01095 Dissolution Tester #96in-maintenance2025-08-22qualified
AST-01096 Hardness Tester #97out-of-service2025-05-03qualified
AST-01097 Friability Tester #98cleaning-required2024-12-15qualified
AST-01098 Particle Size Analyzer #99operational2025-09-27requalification-due
AST-01099 Microscope #100operational2026-03-30not-qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Equipment ConflictminorclosedNot linked
Equipment Conflictminorcloseddev-01180
Equipment ConflictminorclosedNot linked
Equipment ConflictminorclosedNot linked
Equipment ConflictminorclosedNot linked
Equipment ConflictminorclosedNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020179
Score: 97
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review complete - all criteria met.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.