About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-02-02 → 2024-02-06
Actual
2025-01-23 → 2024-07-04
Exceptions
18
Release Risk
critical
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010429Talc Variant 4expiredOpen workbench
LOT-010430Colloidal Silicon Dioxide Variant 4consumedOpen workbench
LOT-010431Stearic Acid Variant 4in-processOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01286 Bioreactor #287cleaning-required2025-09-30qualified
AST-01287 Centrifuge #288operational2025-05-15qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
System ErrormajorclosedNot linked
System Errormajorcloseddev-01144
System ErrormajorclosedNot linked
System ErrormajorclosedNot linked
System ErrormajorclosedNot linked
System Errormajorcloseddev-00644
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020143
Score: 73
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedOpen
Calibration compliantComplete
Training confirmedComplete

Release review blocked - critical items outstanding.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.