About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2025-02-06 → 2025-02-20
Actual
2025-03-28 → 2024-05-14
Exceptions
19
Release Risk
medium
Step Timeline
StepStatusStartEndResult
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010416Methanol HPLC Grade Variant 3approvedOpen workbench
LOT-010417Hydrochloric Acid 37% Variant 3quarantineOpen workbench
LOT-010418Sodium Hydroxide Variant 3holdOpen workbench
LOT-010419Phosphoric Acid Variant 3rejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01032 Cartoning Machine #33in-maintenance2026-03-01qualified
AST-01033 Blister Packer #34out-of-service2025-04-21requalification-due
AST-01034 Shrink Wrapper #35cleaning-required2026-05-15not-qualified
AST-01035 Checkweigher #36operational2025-03-01qualified
AST-01036 Metal Detector #37operational2025-11-20qualified
AST-01037 X-Ray Inspection #38operational2026-07-11qualified
AST-01038 Leak Tester #39in-calibration2025-02-05requalification-due
AST-01039 Torque Tester #40in-maintenance2025-10-05not-qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
Out of Specificationminorcloseddev-00605
Out of Specificationminorcloseddev-00105
Out of SpecificationminorclosedNot linked
Out of SpecificationminorclosedNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020104
Score: 85
EBR completionOpen
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review in progress - minor items pending.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.