About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2026-09-26 → 2026-10-06
Actual
2026-07-25 → In progress
Exceptions
18
Release Risk
low
Step Timeline
StepStatusStartEndResult
001 Line Clearance Checkcompleted2026-01-29T05:52:00.000Z2025-05-25T21:25:00.000Z-
002 Dispensing Startcompleted2025-07-23T15:47:00.000Z2026-08-29T16:20:00.000ZCompleted as per SOP
003 API Weighingin-progress2026-08-28T00:36:00.000Z--
004 Excipient Weighingpending---
005 Granulation Startexception2025-05-09T22:06:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
006 Granulation End Weightcompleted2025-09-12T21:17:00.000Z2026-06-03T15:27:00.000ZCompleted as per SOP
007 IPC - Loss on Dryingcompleted2026-09-18T05:34:00.000Z2026-05-22T18:33:00.000Z-
008 Blending Startcompleted2026-01-09T02:38:00.000Z2025-11-25T11:11:00.000ZCompleted as per SOP
009 Blending Time Verificationin-progress2026-07-24T17:16:00.000Z--
010 IPC - Blend Uniformitypending---
011 Compression Setupexception2026-01-14T06:38:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
012 IPC - Tablet Weightcompleted2026-06-21T21:27:00.000Z2026-05-31T22:02:00.000ZCompleted as per SOP
013 IPC - Tablet Hardnesscompleted2026-02-14T08:54:00.000Z2025-12-12T09:22:00.000Z-
014 IPC - Tablet Friabilitycompleted2026-06-01T00:41:00.000Z2026-10-21T00:41:00.000ZCompleted as per SOP
015 IPC - Tablet Dissolutionin-progress2026-10-17T01:12:00.000Z--
016 Film Coating Setuppending---
017 IPC - Coating Weight Gainexception2025-12-11T11:47:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
018 IPC - Tablet Appearancecompleted2025-01-11T15:46:00.000Z2025-04-29T07:15:00.000ZCompleted as per SOP
019 Filling Setupcompleted2026-06-12T20:22:00.000Z2026-01-06T15:40:00.000Z-
020 IPC - Fill Weight Checkcompleted2025-04-24T12:51:00.000Z2026-07-29T21:06:00.000ZCompleted as per SOP
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010488Povidone K30 Variant 6approvedOpen workbench
LOT-010489Talc Variant 6quarantineOpen workbench
LOT-010490Colloidal Silicon Dioxide Variant 6holdOpen workbench
LOT-010491Stearic Acid Variant 6rejectedOpen workbench
LOT-010492Titanium Dioxide Variant 6expiredOpen workbench
LOT-010493Polyethylene Glycol 400 Variant 6consumedOpen workbench
LOT-010494Polysorbate 80 Variant 6in-processOpen workbench
LOT-010495Mannitol Variant 6approvedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01366 Bioreactor #367operational2024-08-10qualified
AST-01367 Centrifuge #368in-calibration2025-04-10qualified
AST-01368 Lyophilizer #369in-maintenance2026-10-03requalification-due
AST-01369 Filling Machine #370out-of-service2025-09-02not-qualified
AST-01370 Visual Inspection System #371cleaning-required2025-04-13qualified
AST-01371 Weighing Balance #372operational2025-10-07qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Line Clearance Check10092 to 109Pass / Pending review
API Weighing9997 to 104Pass / Pending review
IPC - Loss on Drying9892 to 102Pass / Pending review
Blending Time Verification10498 to 104Pass / Pending review
IPC - Tablet Hardness10096 to 110Pass / Pending review
IPC - Tablet Dissolution10190 to 110Pass / Pending review
Filling Setup10296 to 108Pass / Pending review
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewdev-00062
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020061
Score: 95
EBR completionComplete
Exceptions closedComplete
QC approvedOpen
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review complete - all criteria met.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.