This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-04-14 → 2024-04-18
Actual
2026-02-14 → 2026-06-03
Exceptions
22
Release Risk
high
Step Timeline
StepStatusStartEndResult
001 Line Clearance Checkcompleted2026-02-14T04:17:00.000Z2026-07-25T17:57:00.000Z-
002 Dispensing Startcompleted2026-09-02T19:27:00.000Z2025-05-20T15:43:00.000ZCompleted as per SOP
003 API Weighingin-progress2026-01-29T00:10:00.000Z--
004 Excipient Weighingpending---
005 Granulation Startexception2026-08-22T16:07:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
006 Granulation End Weightcompleted2025-04-29T18:04:00.000Z2026-07-23T00:18:00.000ZCompleted as per SOP
007 IPC - Loss on Dryingcompleted2026-02-19T17:26:00.000Z2025-08-18T13:45:00.000Z-
008 Blending Startcompleted2025-12-21T03:56:00.000Z2026-07-20T03:33:00.000ZCompleted as per SOP
009 Blending Time Verificationin-progress2025-09-01T05:32:00.000Z--
010 IPC - Blend Uniformitypending---
011 Compression Setupexception2026-10-17T01:19:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
012 IPC - Tablet Weightcompleted2026-01-30T04:03:00.000Z2025-12-19T06:27:00.000ZCompleted as per SOP
013 IPC - Tablet Hardnesscompleted2026-09-20T19:33:00.000Z2026-12-28T23:56:00.000Z-
014 IPC - Tablet Friabilitycompleted2026-07-01T12:51:00.000Z2025-08-12T02:59:00.000ZCompleted as per SOP
015 IPC - Tablet Dissolutionin-progress2026-07-10T05:33:00.000Z--
016 Film Coating Setuppending---
017 IPC - Coating Weight Gainexception2026-04-10T07:41:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
018 IPC - Tablet Appearancecompleted2025-07-22T04:51:00.000Z2025-10-02T12:06:00.000ZCompleted as per SOP
019 Filling Setupcompleted2025-08-20T04:53:00.000Z2026-12-26T08:02:00.000Z-
020 IPC - Fill Weight Checkcompleted2025-01-23T13:42:00.000Z2026-06-12T03:12:00.000ZCompleted as per SOP
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010138Histidine Buffer Variant 4quarantineOpen workbench
LOT-010139Sodium Chloride Variant 4holdOpen workbench
LOT-010140Water for Injection Variant 4rejectedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01322 Film Coater #323operational2025-04-11qualified
AST-01323 Capsule Filler #324operational2025-10-01requalification-due
AST-01324 Blender #325operational2026-07-10not-qualified
AST-01325 Autoclave #326in-calibration2025-01-01qualified
AST-01326 Bioreactor #327in-maintenance2026-01-21qualified
AST-01327 Centrifuge #328out-of-service2025-04-18qualified
AST-01328 Lyophilizer #329cleaning-required2025-07-09requalification-due
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Line Clearance Check10193 to 105Pass / Pending review
API Weighing9994 to 109Pass / Pending review
IPC - Loss on Drying9895 to 109Pass / Pending review
Blending Time Verification9898 to 105Pass / Pending review
IPC - Tablet Hardness10194 to 109Pass / Pending review
IPC - Tablet Dissolution10598 to 104Pass / Pending review
Filling Setup10090 to 106Pass / Pending review
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Procedure Deviationminorunder-reviewNot linked
Procedure Deviationminorunder-reviewNot linked
Procedure Deviationminorunder-reviewdev-00547
Procedure Deviationminorunder-reviewNot linked
Procedure Deviationminorunder-reviewdev-01047
Procedure Deviationminorunder-reviewNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020046
Score: 87
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantOpen
Training confirmedComplete

Release review in progress - minor items pending.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.