About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2024-12-16 → 2024-12-24
Actual
Pending → In progress
Exceptions
17
Release Risk
medium
Step Timeline
StepStatusStartEndResult
001 Line Clearance Checkcompleted2026-10-01T12:22:00.000Z2025-11-04T15:59:00.000Z-
002 Dispensing Startcompleted2025-07-20T23:09:00.000Z2026-09-16T22:47:00.000ZCompleted as per SOP
003 API Weighingin-progress2026-12-03T21:42:00.000Z--
004 Excipient Weighingpending---
005 Granulation Startexception2026-11-10T21:15:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
006 Granulation End Weightcompleted2026-08-19T21:06:00.000Z2025-04-15T01:14:00.000ZCompleted as per SOP
007 IPC - Loss on Dryingcompleted2025-01-16T07:40:00.000Z2025-06-10T03:25:00.000Z-
008 Blending Startcompleted2025-06-12T11:02:00.000Z2025-01-30T12:47:00.000ZCompleted as per SOP
009 Blending Time Verificationin-progress2026-09-02T14:11:00.000Z--
010 IPC - Blend Uniformitypending---
011 Compression Setupexception2026-09-30T02:35:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
012 IPC - Tablet Weightcompleted2025-07-26T12:24:00.000Z2025-07-24T16:46:00.000ZCompleted as per SOP
013 IPC - Tablet Hardnesscompleted2026-04-01T07:57:00.000Z2026-09-29T10:21:00.000Z-
014 IPC - Tablet Friabilitycompleted2026-05-28T09:04:00.000Z2025-05-07T12:55:00.000ZCompleted as per SOP
015 IPC - Tablet Dissolutionin-progress2025-07-09T20:06:00.000Z--
016 Film Coating Setuppending---
017 IPC - Coating Weight Gainexception2025-07-20T04:31:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
018 IPC - Tablet Appearancecompleted2025-12-27T23:15:00.000Z2026-01-03T04:47:00.000ZCompleted as per SOP
019 Filling Setupcompleted2025-02-20T11:13:00.000Z2025-08-21T23:28:00.000Z-
020 IPC - Fill Weight Checkcompleted2026-06-13T07:20:00.000Z2026-03-20T03:13:00.000ZCompleted as per SOP
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010312Titanium DioxideexpiredOpen workbench
LOT-010313Polyethylene Glycol 400consumedOpen workbench
LOT-010314Polysorbate 80in-processOpen workbench
LOT-010315MannitolapprovedOpen workbench
LOT-010316SucroseapprovedOpen workbench
LOT-010317TrehaloseapprovedOpen workbench
LOT-010318Histidine BufferquarantineOpen workbench
LOT-010319Sodium ChlorideholdOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01195 Checkweigher #196cleaning-required2026-01-16qualified
AST-01196 Metal Detector #197operational2025-06-22qualified
AST-01197 X-Ray Inspection #198operational2025-12-15qualified
AST-01198 Leak Tester #199operational2025-06-05requalification-due
AST-01199 Torque Tester #200in-calibration2025-12-15not-qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Line Clearance Check9991 to 107Pass / Pending review
API Weighing10597 to 102Pass / Pending review
IPC - Loss on Drying10495 to 106Pass / Pending review
Blending Time Verification10294 to 109Pass / Pending review
IPC - Tablet Hardness10596 to 103Pass / Pending review
IPC - Tablet Dissolution9893 to 105Pass / Pending review
Filling Setup9894 to 105Pass / Pending review
Exceptions and Deviations
ExceptionSeverityStatusDeviation
System ErrorminorclosedNot linked
System ErrorminorclosedNot linked
System ErrorminorclosedNot linked
System ErrorminorclosedNot linked
System ErrorminorclosedNot linked
System ErrorminorclosedNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020039
Score: 100
EBR completionOpen
Exceptions closedComplete
QC approvedOpen
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review complete - all criteria met.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.