About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2026-08-28 → 2026-09-01
Actual
2025-04-18 → 2025-01-31
Exceptions
2
Release Risk
critical
Step Timeline
StepStatusStartEndResult
001 Line Clearance Checkcompleted2026-01-30T03:51:00.000Z2025-01-01T05:33:00.000Z-
002 Dispensing Startcompleted2025-06-07T13:31:00.000Z2026-03-28T01:27:00.000ZCompleted as per SOP
003 API Weighingin-progress2025-08-26T22:47:00.000Z--
004 Excipient Weighingpending---
005 Granulation Startexception2025-06-29T18:44:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
006 Granulation End Weightcompleted2025-08-04T21:29:00.000Z2026-06-02T19:15:00.000ZCompleted as per SOP
007 IPC - Loss on Dryingcompleted2026-03-17T13:50:00.000Z2025-06-20T11:57:00.000Z-
008 Blending Startcompleted2026-03-19T11:00:00.000Z2025-11-03T00:32:00.000ZCompleted as per SOP
009 Blending Time Verificationin-progress2025-11-22T04:36:00.000Z--
010 IPC - Blend Uniformitypending---
011 Compression Setupexception2025-03-10T06:48:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
012 IPC - Tablet Weightcompleted2025-11-03T19:33:00.000Z2025-08-25T13:43:00.000ZCompleted as per SOP
013 IPC - Tablet Hardnesscompleted2026-09-18T05:46:00.000Z2026-04-03T05:08:00.000Z-
014 IPC - Tablet Friabilitycompleted2026-02-08T15:11:00.000Z2025-12-31T05:59:00.000ZCompleted as per SOP
015 IPC - Tablet Dissolutionin-progress2025-06-28T19:16:00.000Z--
016 Film Coating Setuppending---
017 IPC - Coating Weight Gainexception2026-08-05T02:14:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
018 IPC - Tablet Appearancecompleted2025-04-24T17:38:00.000Z2026-04-24T16:02:00.000ZCompleted as per SOP
019 Filling Setupcompleted2025-03-30T00:21:00.000Z2026-01-05T02:43:00.000Z-
020 IPC - Fill Weight Checkcompleted2026-05-14T18:24:00.000Z2025-09-20T03:59:00.000ZCompleted as per SOP
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010245Hydroxypropyl Methylcellulose Variant 8approvedOpen workbench
LOT-010246Magnesium Stearate Variant 8quarantineOpen workbench
LOT-010247Croscarmellose Sodium Variant 8holdOpen workbench
LOT-010248Povidone K30 Variant 8rejectedOpen workbench
LOT-010249Talc Variant 8expiredOpen workbench
LOT-010250Colloidal Silicon Dioxide Variant 8consumedOpen workbench
LOT-010251Stearic Acid Variant 8in-processOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01140 Laminar Flow Cabinet #141operational2024-12-17qualified
AST-01141 Isolator #142operational2026-07-10qualified
AST-01142 WFI Still #143operational2026-05-24qualified
AST-01143 RO System #144in-calibration2024-12-26requalification-due
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Line Clearance Check10291 to 108Pass / Pending review
API Weighing10391 to 103Pass / Pending review
IPC - Loss on Drying10098 to 107Pass / Pending review
Blending Time Verification9898 to 103Pass / Pending review
IPC - Tablet Hardness10598 to 106Pass / Pending review
IPC - Tablet Dissolution9898 to 105Pass / Pending review
Filling Setup10497 to 103Pass / Pending review
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Equipment Conflictminoropendev-00036
Equipment ConflictminoropenNot linked
Equipment Conflictminoropendev-00536
Equipment Conflictminoropendev-00036
Equipment ConflictminoropenNot linked
Equipment ConflictminoropenNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020035
Score: 61
EBR completionComplete
Exceptions closedComplete
QC approvedOpen
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review blocked - critical items outstanding.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.