This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2025-07-11 → 2025-07-20
Actual
2024-05-17 → 2024-02-04
Exceptions
3
Release Risk
medium
Step Timeline
StepStatusStartEndResult
001 Line Clearance Checkcompleted2025-06-27T01:06:00.000Z2026-01-14T17:46:00.000Z-
002 Dispensing Startcompleted2026-05-28T00:15:00.000Z2025-11-09T16:56:00.000ZCompleted as per SOP
003 API Weighingin-progress2025-12-01T21:16:00.000Z--
004 Excipient Weighingpending---
005 Granulation Startexception2025-03-06T09:06:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
006 Granulation End Weightcompleted2025-04-19T12:04:00.000Z2026-07-01T21:57:00.000ZCompleted as per SOP
007 IPC - Loss on Dryingcompleted2025-06-14T22:00:00.000Z2025-09-05T05:34:00.000Z-
008 Blending Startcompleted2026-11-23T03:00:00.000Z2025-06-20T02:57:00.000ZCompleted as per SOP
009 Blending Time Verificationin-progress2025-05-11T20:11:00.000Z--
010 IPC - Blend Uniformitypending---
011 Compression Setupexception2025-08-06T11:49:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
012 IPC - Tablet Weightcompleted2025-03-01T09:49:00.000Z2026-07-19T03:36:00.000ZCompleted as per SOP
013 IPC - Tablet Hardnesscompleted2025-05-20T03:08:00.000Z2025-08-12T13:39:00.000Z-
014 IPC - Tablet Friabilitycompleted2026-06-06T19:17:00.000Z2025-07-18T18:02:00.000ZCompleted as per SOP
015 IPC - Tablet Dissolutionin-progress2025-08-22T09:45:00.000Z--
016 Film Coating Setuppending---
017 IPC - Coating Weight Gainexception2026-05-07T21:27:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
018 IPC - Tablet Appearancecompleted2025-04-19T06:31:00.000Z2025-12-04T19:32:00.000ZCompleted as per SOP
019 Filling Setupcompleted2025-01-29T12:56:00.000Z2026-10-20T08:56:00.000Z-
020 IPC - Fill Weight Checkcompleted2025-12-04T23:37:00.000Z2025-06-05T06:36:00.000ZCompleted as per SOP
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010096Magnesium Stearate Variant 3expiredOpen workbench
LOT-010097Croscarmellose Sodium Variant 3consumedOpen workbench
LOT-010098Povidone K30 Variant 3in-processOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01192 Cartoning Machine #193in-calibration2025-07-17qualified
AST-01193 Blister Packer #194in-maintenance2026-05-01requalification-due
AST-01194 Shrink Wrapper #195out-of-service2026-02-07not-qualified
AST-01195 Checkweigher #196cleaning-required2026-01-16qualified
AST-01196 Metal Detector #197operational2025-06-22qualified
AST-01197 X-Ray Inspection #198operational2025-12-15qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Line Clearance Check10591 to 103Pass / Pending review
API Weighing10497 to 109Pass / Pending review
IPC - Loss on Drying10298 to 106Pass / Pending review
Blending Time Verification10394 to 104Pass / Pending review
IPC - Tablet Hardness9997 to 110Pass / Pending review
IPC - Tablet Dissolution10196 to 103Pass / Pending review
Filling Setup9891 to 105Pass / Pending review
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Out of Specificationmajorunder-reviewNot linked
Out of Specificationmajorunder-reviewNot linked
Out of Specificationmajorunder-reviewNot linked
Out of Specificationmajorunder-reviewNot linked
Out of Specificationmajorunder-reviewNot linked
Out of Specificationmajorunder-reviewNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020032
Score: 73
EBR completionOpen
Exceptions closedOpen
QC approvedComplete
Deviations dispositionedOpen
Calibration compliantComplete
Training confirmedComplete

Release review blocked - critical items outstanding.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.