About this view

This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.

Planned
2026-02-17 → 2026-03-01
Actual
2024-10-13 → In progress
Exceptions
23
Release Risk
medium
Step Timeline
StepStatusStartEndResult
001 Line Clearance Checkcompleted2025-03-27T16:21:00.000Z2025-12-13T05:34:00.000Z-
002 Dispensing Startcompleted2025-12-29T13:29:00.000Z2026-09-02T09:56:00.000ZCompleted as per SOP
003 API Weighingin-progress2026-09-24T01:11:00.000Z--
004 Excipient Weighingpending---
005 Granulation Startexception2026-02-16T15:18:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
006 Granulation End Weightcompleted2025-05-29T16:49:00.000Z2025-01-24T22:37:00.000ZCompleted as per SOP
007 IPC - Loss on Dryingcompleted2025-11-28T20:15:00.000Z2026-02-15T14:29:00.000Z-
008 Blending Startcompleted2025-07-30T16:16:00.000Z2025-10-08T03:35:00.000ZCompleted as per SOP
009 Blending Time Verificationin-progress2025-01-18T08:07:00.000Z--
010 IPC - Blend Uniformitypending---
011 Compression Setupexception2025-10-29T16:22:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
012 IPC - Tablet Weightcompleted2026-12-25T09:31:00.000Z2026-05-16T15:22:00.000ZCompleted as per SOP
013 IPC - Tablet Hardnesscompleted2026-10-08T16:41:00.000Z2026-07-13T05:20:00.000Z-
014 IPC - Tablet Friabilitycompleted2026-02-18T10:22:00.000Z2026-05-12T20:43:00.000ZCompleted as per SOP
015 IPC - Tablet Dissolutionin-progress2025-10-24T02:03:00.000Z--
016 Film Coating Setuppending---
017 IPC - Coating Weight Gainexception2025-11-26T14:31:00.000Z-Value out of specification: undefined (spec: undefined-undefined)
018 IPC - Tablet Appearancecompleted2026-12-18T09:48:00.000Z2026-03-10T10:04:00.000ZCompleted as per SOP
019 Filling Setupcompleted2026-05-14T20:15:00.000Z2026-02-28T18:44:00.000Z-
020 IPC - Fill Weight Checkcompleted2025-10-31T13:13:00.000Z2026-07-27T07:28:00.000ZCompleted as per SOP
Materials Consumed and Genealogy
LotMaterialStatusGenealogy
LOT-010147Hydrochloric Acid 37% Variant 4quarantineOpen workbench
LOT-010148Sodium Hydroxide Variant 4holdOpen workbench
LOT-010149Phosphoric Acid Variant 4rejectedOpen workbench
LOT-010150Active Pharmaceutical Ingredient A Variant 5expiredOpen workbench
LOT-010151Active Pharmaceutical Ingredient B Variant 5consumedOpen workbench
LOT-010152Active Pharmaceutical Ingredient C Variant 5in-processOpen workbench
LOT-010153Microcrystalline Cellulose Variant 5approvedOpen workbench
Equipment and Calibration
AssetStatusCalibration DueQualification
AST-01168 Lyophilizer #169operational2024-06-02requalification-due
AST-01169 Filling Machine #170operational2026-04-30not-qualified
AST-01170 Visual Inspection System #171operational2025-02-18qualified
AST-01171 Weighing Balance #172in-calibration2025-05-11qualified
AST-01172 HPLC System #173in-maintenance2026-03-24qualified
AST-01173 UV-Vis Spectrophotometer #174out-of-service2024-07-28requalification-due
AST-01174 Karl Fischer Titrator #175cleaning-required2025-12-31not-qualified
AST-01175 Dissolution Tester #176operational2024-11-26qualified
In-Process Controls and Pending Tests
ControlMeasuredSpecStatus
Line Clearance Check10194 to 110Pass / Pending review
API Weighing10592 to 102Pass / Pending review
IPC - Loss on Drying10298 to 109Pass / Pending review
Blending Time Verification10291 to 105Pass / Pending review
IPC - Tablet Hardness9992 to 110Pass / Pending review
IPC - Tablet Dissolution10591 to 110Pass / Pending review
Filling Setup10291 to 104Pass / Pending review
Exceptions and Deviations
ExceptionSeverityStatusDeviation
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewdev-00022
Environmental Excursionmajorunder-reviewNot linked
Environmental Excursionmajorunder-reviewNot linked
QA Review Checklist and Signatures
  • Step execution completeness verified with signed evidence.
  • All high-severity exceptions dispositioned or justified.
  • QC release tests reviewed and OOS investigations closed or dispositioned.
  • Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020021
Score: 71
EBR completionComplete
Exceptions closedComplete
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete

Release review blocked - critical items outstanding.

Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.