Batch BT-020001
Veranide XR • DRH • L002 • in-process
About this view
This batch detail page ties execution evidence, material genealogy, equipment fitness, in-process controls, and quality events into one release-focused view. Users can trace each unit operation against timestamps and investigate linked exceptions without leaving context. The panelized layout supports QA review by exception while preserving full evidence access. Next actions include closing residual issues and completing disposition-ready evidence checks.
Planned
2025-10-13 → 2025-10-17
Actual
2026-01-23 → In progress
Exceptions
2
Release Risk
low
Step Timeline
| Step | Status | Start | End | Result |
|---|---|---|---|---|
| 001 Line Clearance Check | completed | 2025-06-26T03:32:00.000Z | 2026-01-13T20:07:00.000Z | - |
| 002 Dispensing Start | completed | 2026-08-08T22:36:00.000Z | 2026-05-21T15:10:00.000Z | Completed as per SOP |
| 003 API Weighing | in-progress | 2025-10-14T05:21:00.000Z | - | - |
| 004 Excipient Weighing | pending | - | - | - |
| 005 Granulation Start | exception | 2026-10-30T11:30:00.000Z | - | Value out of specification: undefined (spec: undefined-undefined) |
| 006 Granulation End Weight | completed | 2026-11-06T00:18:00.000Z | 2026-06-18T17:30:00.000Z | Completed as per SOP |
| 007 IPC - Loss on Drying | completed | 2025-03-08T02:41:00.000Z | 2025-02-23T08:38:00.000Z | - |
| 008 Blending Start | completed | 2025-04-17T07:39:00.000Z | 2025-03-30T14:08:00.000Z | Completed as per SOP |
| 009 Blending Time Verification | in-progress | 2025-08-08T15:39:00.000Z | - | - |
| 010 IPC - Blend Uniformity | pending | - | - | - |
| 011 Compression Setup | exception | 2025-09-30T22:51:00.000Z | - | Value out of specification: undefined (spec: undefined-undefined) |
| 012 IPC - Tablet Weight | completed | 2026-12-11T08:03:00.000Z | 2026-10-10T13:22:00.000Z | Completed as per SOP |
| 013 IPC - Tablet Hardness | completed | 2025-03-26T04:35:00.000Z | 2025-01-24T17:57:00.000Z | - |
| 014 IPC - Tablet Friability | completed | 2025-02-06T12:08:00.000Z | 2025-08-13T17:12:00.000Z | Completed as per SOP |
| 015 IPC - Tablet Dissolution | in-progress | 2026-03-16T03:30:00.000Z | - | - |
| 016 Film Coating Setup | pending | - | - | - |
| 017 IPC - Coating Weight Gain | exception | 2025-03-16T10:22:00.000Z | - | Value out of specification: undefined (spec: undefined-undefined) |
| 018 IPC - Tablet Appearance | completed | 2026-08-08T10:39:00.000Z | 2026-08-12T15:26:00.000Z | Completed as per SOP |
| 019 Filling Setup | completed | 2026-04-23T22:52:00.000Z | 2026-10-12T14:12:00.000Z | - |
| 020 IPC - Fill Weight Check | completed | 2026-08-14T00:55:00.000Z | 2026-07-21T04:40:00.000Z | Completed as per SOP |
Materials Consumed and Genealogy
| Lot | Material | Status | Genealogy |
|---|---|---|---|
| LOT-010005 | Hydroxypropyl Methylcellulose | rejected | Open workbench |
| LOT-010006 | Magnesium Stearate | expired | Open workbench |
| LOT-010007 | Croscarmellose Sodium | consumed | Open workbench |
| LOT-010008 | Povidone K30 | in-process | Open workbench |
| LOT-010009 | Talc | approved | Open workbench |
Equipment and Calibration
| Asset | Status | Calibration Due | Qualification |
|---|---|---|---|
| AST-01007 Centrifuge #8 | operational | 2025-09-28 | qualified |
| AST-01008 Lyophilizer #9 | operational | 2026-08-12 | requalification-due |
| AST-01009 Filling Machine #10 | operational | 2026-08-10 | not-qualified |
| AST-01010 Visual Inspection System #11 | in-calibration | 2025-05-23 | qualified |
| AST-01011 Weighing Balance #12 | in-maintenance | 2026-05-08 | qualified |
| AST-01012 HPLC System #13 | out-of-service | 2025-02-09 | qualified |
| AST-01013 UV-Vis Spectrophotometer #14 | cleaning-required | 2025-08-09 | requalification-due |
In-Process Controls and Pending Tests
| Control | Measured | Spec | Status |
|---|---|---|---|
| Line Clearance Check | 100 | 94 to 107 | Pass / Pending review |
| API Weighing | 99 | 95 to 108 | Pass / Pending review |
| IPC - Loss on Drying | 104 | 93 to 104 | Pass / Pending review |
| Blending Time Verification | 98 | 96 to 105 | Pass / Pending review |
| IPC - Tablet Hardness | 100 | 95 to 102 | Pass / Pending review |
| IPC - Tablet Dissolution | 103 | 98 to 107 | Pass / Pending review |
| Filling Setup | 105 | 98 to 102 | Pass / Pending review |
Exceptions and Deviations
| Exception | Severity | Status | Deviation |
|---|---|---|---|
| Missing Signature | major | under-review | dev-00002 |
| Missing Signature | major | under-review | Not linked |
| Missing Signature | major | under-review | Not linked |
| Missing Signature | major | under-review | Not linked |
| Missing Signature | major | under-review | dev-01002 |
| Missing Signature | major | under-review | Not linked |
QA Review Checklist and Signatures
- Step execution completeness verified with signed evidence.
- All high-severity exceptions dispositioned or justified.
- QC release tests reviewed and OOS investigations closed or dispositioned.
- Final release signatory validated with segregation-of-duties check.
Release Readiness: BT-020001
Score: 68
EBR completionComplete
Exceptions closedOpen
QC approvedComplete
Deviations dispositionedComplete
Calibration compliantComplete
Training confirmedComplete
Release review blocked - critical items outstanding.
Disposition recommendation is simulated and requires QA Reviewer persona sign-off before final approval.